Highways, air, ferry and railway traffic are there to guarantee our mobility.
Airport Leipzig/Halle GmbH
Defrosting plant
The airport Leipzig-Halle offers very good conditions for intercontinental passenger and freight traffic. Since 2007 the airport has had two parallel take-off and landing runways. The reconstruction of the south runway meant a parallel system could be operated together with the north runway, which is, like the south runway, also 3600m long.
AllTec delivered extensive automation and EMSR solutions in the fields of:
- Drainage plants
- Wastewater technology
-
Defrosting plant for airfield and aircraft
|
|
DHL Hub Leipzig GmbH
Lighting control
The new European air cargo hub of DHL came into service at Leipzig-Halle airport at the end of the first half of 2008. AllTec built switchgears for the lighting control on the apron in front of the logistics centre.
|
|